Chris Ellison has insisted there was “no design fault” with the newly built haul road to Mineral Resources’ Onslow Iron mine despite spending $230 million fixing the piece of private infrastructure.
1251 Wilcrest Drive
Houston, Texas
77042 USA
Call-832.795.1420
e-mail – news@theinsightpost.com
Theinsightpost ©2026 | All Rights Reserved. Theinsightpost is an Elnegy LLC company, registered in Texas, USA
Discussion about this post