[ad_1]
13 September 2022
by Gareth Jennings
Earlier scheduled for 2023, full operating capability for the UK Lightning Force will not take place until 2025. (Crown Copyright)
The UK is to delay declaring full operating capability (FOC) for its Lockheed Martin F-35 Lightning fleet, with a government minister saying it will now happen in 2025 rather than the earlier stated 2023.
Minister for the Armed Forces, James Heappey, made the disclosure while answering a question in the House of Commons on 12 September.
“Full operating capability for the Lightning Force is expected in 2025, at which point the Lightning Force will be able to operationally deploy both [617 and 809] squadrons concurrently,” he said.
Heappey’s comments marked a departure from the Ministry of Defence’s (MoD’s) earlier stated timeline of declaring initial operating capability (IOC) for the short take-off and vertical landing (STOVL) F-35B in 2023, by which time both 617 Squadron and 809 Naval Air Squadron (NAS) would have been stood-up as the first two front-line units for the type and able to deploy with 12 aircraft each. At this time, 42 of the 48 contracted aircraft would have been delivered, and HMS Prince of Wales
Get the full article by
subscribing to Janes
Already a Janes subscriber?
Keep reading
[ad_2]
Source link